Project Number: 15306C

Project Location/Limits:
Harold Street Wastewater Treatment Plant Improvements

Project Scope:
Design and construct upgrades for for improved treatment, processing and reliability.  Improvements include digester rehabilitation, replacing sludge heaters, methane gas capturing equipment, replacement of high rate trickling filter media, and upgrades to meet NFPA code requirements.

Current Project Status:
The City of Olathe has hired CDM Smith to complete the design for the upgrades identified as necessary in a 2011 plant assessment. The project is now within 90% design which will include upgrades to process improvements for solids handling, digester rehabilitation, replacing the sludge heaters, methane gas capturing equipment, trickling filter media replacement, odor control, structural/electrical/mechanical upgrades and site work.  The design is scheduled to be finalized by the end of December 2013.

Total Project Cost: $9,350,000