Building Permit Information

Print
Press Enter to show all options, press Tab go to next option

A permit may not be required for

A permit is required when

  • Repairing or altering a plumbing or electrical system.
  • Replacing a water heater, furnace or air conditioning unit.

Licenses & Permits

Fees

  • Construction Fee Schedule
  • A fee is required to reinstate expired permits.
  • A penalty fee applies when work is performed without a permit.

Timelines

  • Permits are valid for 180 days after they are issued.
  • Each approved inspection adds 180 days to the permit expiration date.
  • Inactive permit applications are voided after 180 days.

Reports

Additional Resources

Contact Building Codes staff at 913-971-7900 located at 1225 S. Hamilton 

Free viewers are required for some of the attached documents.
They can be downloaded by clicking on the icons below.

Acrobat Reader Download Acrobat Reader Flash Player Download Flash Player Windows Media Player Download Windows Media Player Microsoft Silverlight Download Microsoft Silverlight Word Viewer Download Word Viewer Excel Viewer Download Excel Viewer PowerPoint Viewer Download PowerPoint Viewer